Indian Stone

Project Location:
Project Duration:
5 days
Project Description:
  • Dug out and removed 200mm of turf/soil
  • Installed a 100mm layer of 20mm crusher (sub-base)
  • Installed a cobble boarder to S shape
  • Installed 47m2 of Indian stone laid on full beds of cement to ensure no movement
  • Built a small retaining wall and steps topped off with Indian stone
  • Finished off with jointing compound and natural sealers to fetch out the beautiful colours and maintain a non-slip surface

Our customer was over the moon! Check out their reviews on Yell and Google.

Project Gallery:

Get A Free Quote

  • We promise never to sell your info to anyone!