Recent Projects

Patio Walkway

  • Removal of old concrete disability ramp from below damp proof which was causing internal problems in the property
  • Installed arco drains, new kandla grey Indian stone walkways, patio and steps and finished with buff jointing compound and natural sealer
  • Replaced all shattered brick toppers with new blues
Project Location: Sheffield
Project Duration: 9 days

Balcony

  • Double French doors removed and replaced with triple leaf French doors including installation of RSJ
  • Re-plastered inside
  • Installed new skirtings and coving
  • Installed new steel frame balcony complete with security glass and finished with timber decking
Project Location: Barnsley
Project Duration: 5 days