Patio Walkway
- Removal of old concrete disability ramp from below damp proof which was causing internal problems in the property
- Installed arco drains, new kandla grey Indian stone walkways, patio and steps and finished with buff jointing compound and natural sealer
- Replaced all shattered brick toppers with new blues
Project Duration: 9 days
Balcony
- Double French doors removed and replaced with triple leaf French doors including installation of RSJ
- Re-plastered inside
- Installed new skirtings and coving
- Installed new steel frame balcony complete with security glass and finished with timber decking
Project Duration: 5 days