Indian Stone
- Dug out and removed 200mm of turf/soil
- Installed a 100mm layer of 20mm crusher (sub-base)
- Installed a cobble boarder to S shape
- Installed 47m2 of Indian stone laid on full beds of cement to ensure no movement
- Built a small retaining wall and steps topped off with Indian stone
- Finished off with jointing compound and natural sealers to fetch out the beautiful colours and maintain a non-slip surface
Our customer was over the moon! Check out their reviews on Yell and Google.
Project Duration: 5 days